一级特黄毛片,www.欧美色,91久久久精品无码一区二区大全,韩国欧洲一级

Your Position: Home > Support > Update Center

Replacement of Air-cooled System Port of Oil Filter

2019/8/1??????view:
1. Cleaning gas town import filter
Tools needed:
10mm, 17mm open wrench or socket wrench.
Remove the top fastening screw of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94a), and remove the cover.
Remove the clamp chain of the air ballast filter. Clean the filter with suitable solvent. It is then dried and re-loaded in reverse order.
2. Check float valve
Tools needed:
10 mm, 13 mm, 17 mm open wrench or socket wrench.
During the operation of the pump, check the air tightness of the float valve and the return tubing if the pressure can not fall below 5 mbar.
Remove the top fastening screw of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94a), and remove the cover.
Remove the return tubing (6/11).
Remove four screws (6/12) and pull the assembly out of the float chamber. Remove the pad (6/9).
Clean the oil nozzle. Check the air tightness of the float valve.
Check all liners and renew them if necessary.
Reload the float valve in reverse order.
warning
According to the process involved, hazardous substances may spill over from pumps and oils. Take corresponding measures. Comply with safety regulations.
Importantly, when handling used oil, please observe the relevant environmental regulations!
Be careful not to install used seals; new seals must be installed.
3. Replacement of exhaust valve
Tools needed:
10mm, 17mm open wrench or socket wrench.
Discharge pump oil (6/5);
Remove the top fastening screw of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94a), and remove the cover.
Remove tubing (6/11, 6/15 and 6/18); unscrew nut (6/19) and exhaust box; remove liner (6/22).
Remove the crew, remove the valve pressure plate (6/21) and the exhaust valve (6/20).
Reload in reverse order.
Pay attention to the direction of the exhaust valve sheet and press it towards the pump body.
According to the process involved, hazardous substances can spill over from pumps and oils. Take corresponding measures.
主站蜘蛛池模板: 无码任你躁久久久久久| 日本高清免费一本视频网站| 麻豆成人一区二区| 三级黄色AⅤ大片| 麻豆成人av| 亚洲伦理中文字幕电影| 少妇XXXXX性开放| 菠萝一区二区欧美| 中文字幕无码av波多野吉衣| 美国人妻视频一区二区| 国产在线精品一区二区夜色| 日夜啪啪一区二区三区| 蜜臀av性久久久久蜜臀aⅴ四虎| 免费看小12萝裸体视频国产| 国内精品久久久久久中文字幕| 老人影院黄色视频| 国产美女爽到喷出来久久久久| 性爱小视频免费看| 色欲AV一区二区三区天美传媒| 国产精品香蕉在线观看| 日韩无码深夜福利视频| 性欧美美国一级a毛片| 内射毛片内射国产夫妻| 久久精品国产99国产精2020有什么新功能| 最新av偷拍av偷窥av网站| 小色哥也色爱爱成人网| 亚洲永久精品ww47| 美女黄视频福利姬| 国产成人涩涩涩视频在线观看| 无码人妻精品一区二区二秋霞影院| 人人妻人人澡人人爽人人爱| 久久久久久人妻| 午夜色色色福利视频| 黄色一级性爱视频| 亚洲AV无码久久寂寞少妇| 亚洲精品久久久| 99精品国自产在线| 国产在线精品一区二区夜色| 最新日韩欧美不卡一二三区| 亚洲毛片无码不卡AV在线播放| 无码国产手机小视频第18期|