Installation and Daily Maintenance of Roots Pump of Oil Filter

2019/8/1??????view:

  In the operation, hoisting, installation, use and maintenance of equipment, the correct processing procedures must be strictly followed.

  Once improperly operated, the internal or external transmission parts and driving equipment of the pump may also cause serious damage to the human body. It is strictly forbidden to start the vacuum pump when the intake cover or exhaust cover of the pump and the refueling and discharging ports are dismantled. If we want to check or maintain the moving parts of the pump, we must first completely cut off and lock the control power equipment.

  Higher temperature on the surface of roots pump housing and connecting pipes and accessories may cause injury when human body contacts.

  1.Dismantling and hoisting

  1.If the pump is packed in wooden cases, care should be taken not to touch the shell of the pump when it is unpacked.

  2.If the pump does not have a lifting ring, it must be lifted with hemp rope at the front and rear end caps of the pump or carried by forklift truck.

  2.Installation site:

  Roots vacuum pump should be installed in bright, dust-free and well ventilated buildings.

  The installation environment temperature of Roots vacuum pump is 5-40 C.

  There should be enough room around Roots vacuum pump for routine inspection, maintenance, disassembly and assembly.

  3.Fondation works:

  Roots vacuum pump can be installed on the same rack as the front pump to form a unit and then installed on the concrete foundation. Large pumps can be installed on the cement foundation separately, and the reserved holes of foundation bolts can be watered with concrete.

  According to the weight of Roots vacuum pump and the pressure resistance of foundation, the compressive area and depth of concrete foundation are determined.

  In order to bury foundation bolts in concrete, sufficient voids must be left out according to the location of foundation holes when concrete foundation is poured.

  The base surface must be horizontal.

  4.Installation:

  Wood frame is made according to the position of bottom foot hole of pump or unit. The foundation bolt is fixed on the wooden frame, placed in the reserved hole, and then concrete is poured into the reserved hole, placed for several days, and the wooden frame is removed after concrete hardening.

  The roots vacuum pump is put on the foundation, the level is calibrated with a level meter, the uneven part is hardened with metal gaskets, the foundation bolts are tightened, and the bottom cracks are filled with cement.

  5. Pipeline installation:

  Notes: If welding slag and other foreign matter enter the pump during pipeline installation, Roots pump and front pump will be met.

  Cause serious damage or damage, once similar situation occurs, the pipeline and pump must be strictly cleaned up.

  There are no foreign bodies such as welding slag and impurities in the intake and outlet gas pipelines, which have sufficient channel capacity.

  A flexible hose should be installed in the connecting pipe between the outlet of Roots vacuum pump and the inlet of the front stage pump to reduce the influence of vibration of the front stage pump on the Roots vacuum pump.

  In order to shorten the pre-pumping time, besides connecting the inlet of the front pump with the outlet of Roots vacuum pump, bypass pre-pumping pipes and valves can also be installed in the general system.

  In order to prevent the return of oil or water when the front pump stops (when the front pump adopts water ring vacuum pump), the exhaust valve or check valve should be installed on the inlet pipe of the front pump.

  The connection flange of the pipeline is sealed with O-type rubber sealing ring and coated with vacuum coke grease. The whole vacuum system must be sealed without leakage.

  If the pipeline is too heavy, it must be properly supported. In order to avoid affecting the normal operation of the pump

  Vacuum pumps equipped with cooling water shall be equipped with adjusting valves on the pipes at the cooling water inlet in order to control the amount of water.

  6. Installation of electrical equipment:

  Roots vacuum pump can only work within the prescribed inlet pressure range. When the current stage pump stops working, Roots vacuum pump must stop working at the same time. Therefore, electrical equipment must have interlocking and necessary automatic overload and overheating protection devices.

  The wiring of the motor must make the steering of the pump in the direction indicated by the arrow.

  Small pumps can start directly. Large pumps should be equipped with starters, such as pressure-reducing starter.


主站蜘蛛池模板: 无码精品亚洲日韩| 指比视频亚洲天堂| 免费精东传媒VS天美传媒| 亚洲最大人人av| 99久久免费国产精品| 色成人AV手机电影网| 精品久久人人做人人爽综合| 人妻一级免费观看片| 欧美激情一区二区久久久久久| 日本人妻丰满熟妇久久久久久| av女优电影无码在线观看| 老年午夜网| 国产精品国产AV片国产| 麻豆一区二区三区精品视频| 俄美一级性爱视频一区二区| 日韩制服国产精品一区| 岛国aaaa级午夜福利片| 国产成人8x人网站视频| 亚洲色精品国产一区二区三区| 精品国产AⅤ无码一区二区| 色图天堂电影| 亚洲视频一区二区三区| 亚洲高清国产一区二区三区| 无码专区―va亚洲v专区在线| 女教师の爆乳bd在线观看| 国产精品欧洲精品视频| 色丫头综合| 亚洲精品无码高清专区综合日韩精| 东京花甲年岁色片视频一区| 插入视频在线免费观看| 久久精品国产亚洲av麻豆网站| 日韩影音| 国产av日韩a∨亚洲av电影| 免费观看性爱小视频| 亚洲AV无码专区在线观看下载| 高龄女优无码电影| 亚洲国产一二三区欧美日韩| 91人妻人人做人碰人人爽| 精品人妻无码一区二区三区牛牛| 91人人妻人人做人人爽京东| 99视频这有这里有精品|